Showing posts with label hot concrete load. Show all posts
Showing posts with label hot concrete load. Show all posts

Friday, May 22, 2009

No Hot Loads, Ever

It happens. Waste and charges due to project delays. Sometimes unavoidable, and often from last minute issues out of your control.

Have a load of concrete sit in a standard transit mixer for too long and it will no longer be usable, it goes "hot" - or sets too much to be usable for your project. Once hot, the concrete will need to be dumped - either at your site (hope you have a big hole to fill) or back at the concrete yard with incredible service fees. This can happen from a number of reasons, including:
  • Failed inspections
  • Difficult locations
  • Traffic and accidents
  • Weather
  • Wait time

On the other hand, Fresh Concrete is never hot as it is manufactured as needed from a volumetric mixer truck - which can be thought of as a mobile cement plant. Just like a plant, the mix can be dialed in to fit the situation, but we find a good quality result with a standard seven sack mix.

Start and stop? Wait? Difficult location? Inspector late? Whatever. Never a hot load.

Check us out at: http://www.bayareafreshconrete.com/

Or give us a call at: (650) 276-0499

Always happy to help!